In build · Coming soon

Idoneity-EHS.
The rest of the safety professional’s day.

Contractor management is one hat. Incidents, permits to work, process safety, shift handover, chemicals, waste clocks and environmental obligations are the others — and they are usually a spreadsheet, a binder, an inbox and somebody’s memory. Idoneity-EHS is being built for all of it, on the same terms as the platform you are already looking at: every module included, the price on a page, and records that can’t be quietly edited after the fact.

No launch date promised. Early-list companies pick which modules get finished first — and if you run your contractor program here, the two products already know each other.

The shape of it

Modules that write to each other

An inspection finding, a near miss and a management-of-change review all raise into the same corrective-action tracker. The chemical inventory carries the CAS number, so it already knows which waste profiles it ends up in. Eight separate products cannot do that, however well each one demos.

Nothing rides on memory

Shift passdown

The system writes the handover draft itself — every live permit, fresh incident, late action, and running clock, frozen at the moment of handover. Outgoing adds words; incoming signs.

Facts in, the log falls out

Incidents & the OSHA log

Report the facts once. Recordability is computed, the 300 log and 300A totals assemble themselves, and a recordable can't close while its corrective actions are still open.

Gates that can say no

Permits to work

Hot work, confined space, excavation, LOTO. One failed gate refuses the permit — and a refused permit is the control working, not the software being difficult.

MOC with the review built in

Process safety

Every change opens with its pre-startup review attached. A temporary change carries an expiry or it's refused, and no change closes with a review line unanswered.

One spine for everything

Corrective actions

Inspections, observations, incidents, and reviews all raise actions into the same tracker — each one traceable to what raised it, and closable only with evidence and a name.

Every clock, already running

Waste & environmental

Accumulation clocks, manifest returns, permit obligations — tracked from the dates that matter, with the deadline math done before anyone has to remember it.

The March report, already done

Chemicals & Tier II

The inventory carries the CAS number, so each line knows which waste profiles it ends up in — and the Tier II screen aggregates itself from data you already hold.

Two products, one answer

The Idoneity bridge

“Contractor clear to work” stops being a checkbox. The permit gate resolves live against the clearance your Idoneity contractor program already computes.

A first look at the working build — real screens, no mockups. Press play.
The number, before you ask for it

Per site. Per month. Published.

The same rule as the contractor platform: you should be able to work out what this costs without booking a call, and the number you sign should be the number that holds.

From $595

per site, per month — the entry tier for a single site getting off spreadsheets.

$595 – $1,450

the whole published range. Your permits pick the tier, so you cannot over-buy.

99 users included

per site — everyone on site can report on day one. Above 99: one published step, plus $4 per user / month for the users above it.

4.5% renewal cap

the most an existing customer's rate can rise in a year, written into the contract rather than promised.

If you already run Idoneity, the EHS line is 3% lower

A standing discount on the EHS subscription for every year you hold both products — re-verified at each renewal, and never taken back out of your contractor-platform price. Rates shown are the 2026 list.

What it will not do

A coming-soon page is the easiest place in the world to promise too much, so here is the other half.

It will not make the call for you

Recordability, classification, whether a change is safe to start — the system computes and proposes, a named human approves. It is a decision aid, and it is built to leave your name on the decision.

It has not launched yet

The modules on this page are built and running in the development build. There is no hosted portal to sign into today, and we are not naming a date we might miss.

It will not read your mind

Which sections switch on is driven by the permits you hold — send them in and the conditions become dated obligations. Until they exist, the calendar is empty on purpose.

Early list

Pick what gets finished first

The build order is not settled. Tell us which part of your week hurts most and it moves up — and you will see the working version before anyone else does.

Which would you want first?

Optional. The early list sets the build order — this is the vote.

No newsletter, no drip sequence. One note when there’s something real to show, and one when it opens.

Rather just talk? Use the contact page, or read how the contractor side works on the platform page.